Showcase

See what TideLine produces.

Every image on this page came out of TideLine itself, run on sample projects. No mock-ups. Your schedule gives you the same slides and charts in a few clicks.

Used by project controls and claims teams at

MurphyCanadianElite Analytics IncHKASystech

Schedule · Roadmap

Board-ready roadmap slides

Eight slide layouts and four colour looks, drawn from your live schedule with planned vs current, progress and key milestones. Export as an editable PowerPoint slide or a picture.

Metrics · Delay

Comparison, critical path and productivity charts

Load a baseline and an update: TideLine groups the work by WBS, traces the longest path, measures lost productivity and draws the progress curves — ready for a report or a claim exhibit.

Schedule · Earned value

Earned value management

Hours, cost or duration as the basis, grouped by WBS or activity code. Plan from the baseline, earned and forecast from the current schedule.

Field collaboration

Send activities to the team and get updates back

Assign activities from the schedule to team members. They accept, report progress with photos and blockers, and you approve before anything changes.

  • Accept or decline, with update requests and due dates
  • Automatic reminders, a Monday summary and an in-app inbox
  • Comments, site photos and blockers on every activity
  • Assignment board, My Work and critical path on one WBS Gantt

And more in every plan

Presentation studio

Eight ready-made views of the schedule, team comments and member-only share links, without touching the working schedule.

Editable PowerPoint roadmaps

Eight slide layouts and four colour looks, exported as native, editable PowerPoint shapes.

PDF and print

Paper size, orientation, fit to width or one page, with the timescale and table headings repeated on every page.

Critical delay and recovery

Delay and time recovered per month or per update, against completion or a milestone, split by responsibility.

Metrics dashboard

Arrange tiles from preset layouts, present them, and export to PowerPoint or PDF.

Time-chainage view

Location across, time down for linear projects, with clash checks between crews.

Copy, cut and paste with logic

Move or copy activities and whole WBS branches with their properties and relationships, with one-step Undo.

Progress S-curves

Spread activity by activity over total scope, with sub-curves by WBS or activity code and five templates.

Autosave and version history

One cloud project per workspace, saved every 30 seconds, with named versions and 30-day checkpoints.

Make these from your own schedule.

Import a Primavera P6 XER or build in TideLine. 14-day free trial, no credit card.