Who this is for
Planners and project controls teams on construction and infrastructure projects who need CPM rigour, and the commercial and delivery managers who have to read the output. It suits contractors preparing programmes and updates, owners and PMs reviewing what they receive, and consultants working across several matters at once.
It is deliberately not a generic task tracker. If the programme has to withstand a contractual review, list-based tools are the wrong instrument.
Build, update, and prove
Create the programme or import it, progress it update by update, and TideLine keeps the history. Each update recalculates the network and records what changed — durations, logic, dates and the driving path — so the story of the job is captured while it happens rather than reconstructed afterwards.
Quality checks run on every version: open ends, negative float, hard constraints, long durations and out-of-sequence progress, in the DCMA 14-point framework.
Presentation is part of the job
Most scheduling tools stop at the working view. TideLine treats the executive Gantt as a first-class output: control bar sizes, row heights, fonts and colours, choose a layout, and export a slide that needs no clean-up before a board meeting.