Schedule
Build, update and present CPM programmes.
A full critical-path scheduling workspace. Create activities and WBS structure, link logic, apply calendars and constraints, run forward and backward passes, then progress the schedule update by update. The same data drives presentation-grade Gantt boards for executive reporting, so you never rebuild the programme in PowerPoint.
Included from: Starter — $15/month per seat
7
Gantt presentation layouts
4
Relationship types with lag
0
Slides rebuilt by hand
How it works
Load or build
Import a P6 XER/XML export, or build the programme from scratch in the activity grid. Calendars, WBS and relationships map automatically on import.
Structure the logic
Select activities and chain them with FS links in one click, insert milestones, set constraints and roll up summary bars.
Progress and recalculate
Move the data date, enter actuals and remaining durations. TideLine recalculates the network and re-flags the critical path instantly.
Present it
Pick a Gantt layout, tune bar size, colours, labels and date formats, then export an editable PowerPoint board or a high-resolution PNG.
What it does
- ■Activity, WBS and milestone editing with inline grid and Gantt
- ■FS/SS/FF/SF relationships with lag, chain-link and unchain tools
- ■Forward/backward pass, total and free float, critical path highlighting
- ■Calendars, constraints, data date and progress updates (% and actual dates)
- ■Seven live Gantt layouts — standard, dense, detailed, presentation, programme board, executive, print
- ■Baseline vs current comparison with date, duration and logic variance
- ■Import Primavera P6 XER/XML, CSV and JSON; export PPTX, PNG and PDF
What you get out
- ●Updated CPM programme
- ●Executive Gantt board (editable PPTX)
- ●Baseline vs update variance table
- ●PNG exhibits at presentation resolution
Who uses it
Planners and project controls teams running day-to-day programme management and monthly executive reporting.