Design
Structure and design the programme before you build it.
The planning layer that sits ahead of the schedule. Design is where you set the WBS and coding structure, activity templates, calendars, phase and area breakdowns, and the layout standards that the whole project inherits — so every update, every report and every export looks and behaves the same way.
Included from: Professional — $49/month per seat
Once
Define standards, apply everywhere
Reusable
Templates across projects
Consistent
Output every single update
How it works
Define the skeleton
Set phases, areas and the WBS tree that the programme will hang from.
Set the rules
Coding, colours, calendars and bar styles are defined once and applied everywhere.
Apply to the schedule
The Schedule module inherits the structure — new activities land in the right place, styled correctly.
Reuse it
Save the whole setup as a template for the next project or the next package.
What it does
- ■WBS, phase and area breakdown design with reusable templates
- ■Activity coding, colour rules and bar styling standards
- ■Calendar library — working weeks, shifts, holidays and shutdowns
- ■Layout and column presets shared across the project
- ■Naming and numbering conventions applied consistently
- ■Template reuse across projects so a programme starts 80% structured
What you get out
- ●Project WBS and coding structure
- ●Calendar library
- ●Reusable programme templates
- ●Consistent presentation standards
Who uses it
Planning managers standardising how programmes are built across a portfolio.